Finding projects without cold calling involves attracting the demand: a Google Ads or Meta Ads ad, a Google Business Profile, a recommendation, or a callback form, followed by a quick call back to the household that requested it. In the energy renovation sector, this is the only legal approach: cold calling has been prohibited since July 26, 2020, and since August 11, 2026, all B2C telemarketing requires prior consent, which the company must be able to prove.
- What exactly will be prohibited in 2026?
- What are the legal channels for finding construction projects?
- How much does it cost to find a construction project without soliciting clients?
- Method: From announcement to meeting in four steps
- Is it still possible to call a household back by phone?
- Frequently Asked Questions
What exactly will be prohibited in 2026?
By 2026, a certified energy efficiency installer (RGE) will no longer be able to call or write to individuals who have not requested their services to sell them energy-saving work. Telemarketing refers to any commercial call made to a consumer without their prior request. In the context of energy renovation, it has been prohibited since July 26, 2020, by Article L223-1 of the French Consumer Code, and Law No. 2025-594 of June 30, 2025, extends the prohibition to SMS messages, emails, and social media (Article L223-8), according to the French National Housing Information Agency (ANIL) (July 2025).
Energy renovation: prohibited, even with consent
Heat pumps, insulation, photovoltaics: no unsolicited calls, texts, emails, or social media messages are permitted. The only exception is for an existing contract (article L223-1). A contract signed after prohibited solicitation is void.
All other sectors: prior consent from August 11, 2026
Consent must be free, specific, informed, unambiguous, and revocable. According to decree no. 2026-662 of July 23, 2026 (Selectra, September 2026), it is valid for a maximum of one year, calls are limited to 4 per 30 days, and are permitted Monday to Friday from 10 a.m. to 1 p.m. and from 2 p.m. to 8 p.m.
Penalties: up to €375,000 and a void contract
The administrative fine can reach €75,000 for an individual and €375,000 for a legal entity (article L242-16), imposed by the DGCCRF (French Directorate General for Competition Policy, Consumer Affairs and Fraud Control). Households can report the violations on SignalConso or by calling 33700.
Practical reading from a campaign provider, not legal advice: the texts are authoritative on Légifrance and your federation (CAPEB, FFB) can validate your scheme.
What are the legal channels for finding construction projects?
Legal channels have one thing in common: the household makes the first move. An inbound lead is a request for a quote or a callback made by an individual on your page or listing, following an advertisement, a search, or a recommendation. According to OpinionWay for Quelle Energie (2017), word-of-mouth remains the primary way to find an installer (45%), ahead of the internet (19%); according to OpinionWay for Sofinco (October 2025), reputation is the top criterion for choosing a RGE-certified tradesperson (55%). Paid channels accelerate what recommendations do slowly.
| Prospecting channel | Legal status in energy renovation | Condition to be met |
|---|---|---|
| 📞 Cold calling | ✗ Banned since July 26, 2020 | Only a contract in progress allows the appeal (art. L223-1) |
| 💬 SMS, email, cold social message | ✗ Prohibited (law no. 2025-594) | Same exception: current contract (art. L223-8) |
| 🔍 Google Ads / Meta Ads | ✓ Legal | Landing page with the mention ’France Rénov' standardized since October 1, 2026" |
| 📍 Google listing and local SEO | ✓ Legal | Link to france-renov.gouv.fr on the website that offers the work |
| 🤝 Sponsorship, referrers, subcontracting | ✓ Legal | Subcontracting limited to two tiers for subsidized works since January 1, 2026 |
| 📲 Reminder at the request of the household | ✓ Legal | A verifiable request will be followed up within 5 working days regarding the requested item (art. R223-4) |
Google Ads and Meta Ads are the fastest channel to scale: the household that types «heat pump subsidy 2026» fills out your form, and this exclusive lead is not sold to anyone. This is the mechanism of our page Exclusive RGE installer leads ; The minimum budget per profession is detailed in Google Ads budget for a tradesperson: the realistic minimum.
How many incoming requests can your area generate?
I will check your ads, landing page and form for free, then I will call you back within 24 hours with a detailed estimate per profession.
How much does it cost to find a construction project without soliciting clients?
A project found through inbound leads is measured by the cost per converted lead: the advertising budget spent to obtain a call from a household that is interested, eligible, and ready to schedule an appointment. In our 2026 campaigns, a lead for exterior insulation costs €21 for Groupe Rénovation de France, with 25% of leads converted, representing approximately €84; for heat pumps, MCY France costs €27 and converts 22%, representing approximately €123; for air conditioning, Initiativ'Énergie costs €14 and converts 28%, representing approximately €50.
Average figures observed, excluding fees, vary depending on the area and season; complete benchmarks in Cost of a lead per profession in 2026.
Method: From announcement to meeting in four steps
The method that replaces cold calling consists of four steps: a compliant page, a form that qualifies and collects the callback request, a quick callback, and proof kept.
A landing page with the mention France Rénov’
Since October 1, 2026, the standardized phrase and the link to france-renov.gouv.fr are mandatory on all energy renovation advertising (decree of July 7, 2026): see France Rénov’ mention required. On WordPress, the France Rénov’ banner plugin from Iotaweb The poster is everywhere.
A form that qualifies and requests a callback
Occupancy status, accommodation, current heating, department, then an unchecked box «I request to be called back by [your company] regarding my project»: your call becomes a response to a solicitation.
A callback within the hour, regarding the requested item
Article R223-4 mandates a callback within 5 business days, limited to the requested work. Callbacks within the hour change the appointment rate: see Why your leads aren't converting.
Proof is kept for each request
Timestamp, IP address, page URL, and text of the checked box: it is up to the company to prove the request. Details in lead generation compliant with the law of August 11, 2026.
Is it still possible to call a household back by phone?
Yes, an installer can call back a household that has requested it: this is not solicitation but a response to a request. According to Selectra (September 27, 2026), Article R223-4 authorizes this callback if the company can prove the request, calls back within 5 business days, and only discusses the requested work; the household can withdraw its consent at any time, even verbally (Article R223-3). Two practices remain prohibited: purchasing a list of phone numbers without proof of a specific request, and sending reminders by SMS to a household that has not requested anything (Article L223-8). Calling back a customer whose work is underway, for additional information related to the contract, remains permissible.
Exclusive incoming requests, with proof of each solicitation.
Landing page compliant, qualification form, callback box tracked, leads never resold in your area. Response within 24 hours.
Frequently Asked Questions
Is telephone solicitation prohibited for tradespeople in 2026?
For energy-saving and renewable energy projects, yes: cold calling has been prohibited since July 26, 2020 (Article L223-1 of the Consumer Code), and Law No. 2025-594 extends this to SMS messages, emails, and social media. For other activities, a call is only permitted since August 11, 2026, with demonstrable prior consent.
How to find construction projects without cold calling?
By generating demand: Google Ads and Meta Ads leading to a compliant landing page, Google listing and local SEO, referrals and influencers, and a form where the household requests a callback. In our 2026 campaigns, an exclusive exterior insulation lead costs €21 and 25% of leads are converted.
Can an installer call back a prospect who has filled out a form?
Yes. According to Article R223-4 of the French Consumer Code, contacting a consumer who has requested a service from the company is permitted if the request can be proven, if the call is made within 5 business days, and if it relates solely to the requested work. Keep the timestamp, IP address, URL, and the text of the checked box.
What is the fine for making a telephone solicitation without consent?
The administrative fine stipulated in Article L242-16 of the French Consumer Code is €75,000 for an individual and €375,000 for a legal entity, imposed by the DGCCRF (French Directorate General for Competition Policy, Consumer Affairs and Fraud Control). Any contract concluded after an unsolicited call is void, and households should report such calls via SignalConso or messages to 33700.
Client figures: average advertising costs observed on our campaigns, excluding fees, cited with the client's consent; they vary according to the area, the season, and the commercial approach. Sources: ANIL, law of July 24, 2020 regulating telephone canvassing, ANIL, analysis of law no. 2025-594 of June 30, 2025, Selectra, telemarketing for construction work and August 11, 2026, Selectra, decree no. 2026-662: 4 calls per 30 days (September 27, 2026), OpinionWay for Quelle Energie, how the French choose their tradesperson (2017), OpinionWay for Sofinco, becoming an RGE-certified craftsman (October 2025), Effy Pro, 9 ways to find construction sites (2026). This article is not legal advice.
